Generation assets creating electrical energy supply tendered through PPAs | | | | | |
---|
Transmission assets supporting the electrical consumption including priority lines from Tabuk to Duba, upgrade of existing 380kV backbone, and interconnection with the SEC grid, invested in phases to achieve rightsizing and optimal timing | | | | | |
---|
Distribution assets / microgrids for Phase 1 locations | | | | | |
---|
Research and innovation | | | | | |
Total | | | | | |